adit
adit概况
n. 入口;平坑
adit词义
n.
入口,横坑,进入;坑道;平洞;
英英释义
adit[ 'ædit ]
n.a nearly horizontal passage from the surface into a mine
adit用法
权威例句
Mine shaft and adit closure apparatus and methodThe Saint Martin La Porte access adit (Lyon–Turin Base Tunnel) revisited
Microbial community biofabrics in a geothermal mine adit
Brittle Rock Failure in the Steg Lateral Adit of the Lötschberg Base Tunnel
Large Slope and Flow Reverse Slope Drainage Construction Technique of Jingping Power Station Adit
Geochemistry of the J-M Reef of the Stillwater Complex, Minneapolis Adit Area II. Silicate Mineral Chemistry and Petrogenesis
Investigations of the Howland Reef of the Stillwater Complex, Minneapolis Adit area; stratigraphy, structure, and mineralization
Geochemistry of the JM (Howland) Reef of the Stillwater Complex, Minneapolis Adit area; I, Sulfide chemistry and sulfide-olivine equ...
Seismic investigations of the Piora Basin using S-wave conversions at the tunnel face of the Piora adit (Gotthard Base Tunnel)
Investigations of the Stillwater Complex. IV. The role of volatiles in the petrogenesis of the J-M Reef, Minneapolis Adit section
adit词源
adit (n.)
"entrance," c. 1600, from Latin aditus "approach, entrance, a going to or drawing near," from past participle stem of adire "to approach," from ad- "to" (see ad-) + ire "to go," from PIE root *ei- "to go" (see ion).
adit造句
1. Window of such an adit pants and T-shirts indicate that people live here.
一个洞穴的窗户。裤子和衬衫表明这里有人居住。
2. Adit Ginde of the University of Colorado Denver, one of the researchers, said in a statement.
丹佛科罗拉多大学的研究人员博士艾迪·金德在一份声明中说道。
3. But many—perhaps most—Americans fall short, according to research by epidemiologist Adit Ginde, MD, at the University of Colorado, Denver.
不幸的是,很多——或者说大多数——美国人摄取量不足,这个结论是根据丹佛的科罗拉多大学医学博士、流行病学家阿迪特·金德(AditGinde)的一项研究得出的。
4. The vacuum degree at tailrace adit varies most significantly at the lowest downstream water level and improves gradually along with the rising of downstream water level.
当下游水位最低时,尾水管进口真空变化最明显,随着下游水位的上升,尾水管进口真空度逐渐改善。
5. During the next few weeks, an adit of your organization will be scheduled and performed to verify implementation of your quality management system and any applicable exclusions .
在接下来的几周内,我们会安排和执行一个对于贵公司的审核,用于核实贵公司的质量管理系统的运行情况和任何试适用的修改。
6. The pump tender has moved up the adit. I pick up his reflective stripes with my cap lamp. He is sitting shirtless in the dark and smiling at the opposite wall.
管理水泵的那个人已经上到了入口处,我用头灯照到它工作服的反射条纹,他在暗处赤裸上身坐着,对着对面的墙笑。
7. By the analysis of the mechanism of deformation and failure of the adit, this paper presents a view which based on the control of the real high of adit, side-pressure is controlled.
通过对巷道变形破坏的机理分析,提出了通过控制巷道实际高度,从而控制侧压的观点。
8. Local ventilation: Portable blow is adopted by the airless end or airless adit for ventilation.
局部通风:矿山生产期间对无贯穿风流的独头工作面或独头硐室采用局扇加强通风。
9. The paper reviews the design and construction of the long inclined shafts, the deep vertical shaft, the parallel adit and the access adit for the tunnel.
文章介绍了越岭隧道的长斜井、深竖井、平导、横洞的设计和施工情况。
10. Actual measures as manual excavation outside of the shield, steel frame supporting and advanced adit for prediction were adopted.
采用人工扩挖旁洞、钢拱架支撑和超前导洞等工程处理措施收到一定成效。
11. The results indicate that the adit is stabile and the value of the given critical antivibration velocity of rock is a little low.
结果表明现爆破下平硐是稳定的,规范中给定的岩体极限抗震速度有些保守。
12. With the progress of the mining operation in Lanjian Iron Ore year on year the effect of blasting vibration on safety of adit is increasing.
随着兰尖铁矿采场水平逐年下降,爆破震动对平硐的安全影响日益突出。
13. Based on which, it made brittle analysis to conveyance system in adit-pass of opencast mine, the result accorded with fact.
基于模糊层次分析法对露天矿山溜井平硐运输系统进行了脆性分析,分析结果与实际情况一致。
14. The effect of the blasting of production on main transported adit was analyzed at Nanfen Iron Open-pit Mine.
分析了南芬露天铁矿生产爆破对主运输平硐的影响。
15. The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.
文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在的渗漏原因进行分析研究。
16. The application of the adit chute in safety and high efficiency in Zijinshan gold mine greatly reduce the transportation costs, with good economic and social benefits achieved.
平硐溜井技术在紫金山金矿的安全、高效应用,大大地降低了运输成本,取得了很好的经济效益和社会效益。
211.154.163.73
17. The seismic tomography technique, as a new geophysical prospection method. This is useful condition by means of cross-hole or cross-adit exploration.
地震层析成像技术作为一种新的物探方法,通过工程中孔,碉间地质条件的探测,进而评价大坝建筑物的工程地质条件是一种有效的手段。
18. Therefore, special design is necessary to strengthen the adit and main tunnel intersection part, especially the side of the acute angle of intersection to guarantee the safety of the structure.
因此,需要对主隧道与横通道交叉部尤其是主隧道与横通道斜交的锐角一侧,给以特别的加强设计以保证结构安全。
19. Adit deep chute; Open gold mine; Application;
平硐深溜井;露天金矿;应用;
20. Adit deep chute; Open gold mine; Application;
平硐深溜井;露天金矿;应用;
21. a tunnel horizontal to the surface leading to a mine is called an adit. There are also vertical shafts at right angle to the surface and inclined or slope shafts at another angle to the surface.
与地表平行通向井下的坑道是平峒。还有与地表成直角的竖井,与地表成一定角度的斜井。
-- 来源 -- 英汉 - 翻译样例 - 工程
22. access adit
辅助坑道
-- 来源 -- 英汉 - 短句参考
23. underground adit
地下信道
-- 来源 -- 英汉 - 翻译参考[网络]
24. Adit planimetric
坑道平面图
-- 来源 -- 英汉 - 翻译参考[网络]
25. connecting adit
联络坑道
-- 来源 -- 英汉 - 翻译参考[网络]
26. ADIT (Analog-Digital Integrating Translator)
模拟-数字积分变换器
-- 来源 -- 英汉 - 翻译参考[网络]
27. ventilation adit
通风平硐
-- 来源 -- 英汉 - 翻译参考[网络]
28. construction adit
施工坑道
-- 来源 -- 英汉 - 翻译参考[网络]
29. exploration adit
勘探洞
-- 来源 -- 英汉 - 翻译参考[网络]
30. adit | tunnel | gallery
平峒| 横坑道
-- 来源 -- 英汉 - 翻译参考[网络]